Opportunity Tracker

What we are tracking
The specific divisions, panels and contracts behind enterprise performance — and whether each is on pace.
Tracked potential
4 opportunities
$2.28M
Captured so far
34% of potential
$781k
Behind pace
$331k off plan
3
Not yet tracked
5 waiting for review
$1.65M
Tracked opportunities
4 shown · sorted by remaining value, weighted by how far behind pace
Solid line is what has actually been captured. Dashed line is where the plan says we should be by now.
OpportunityPotentialCaptured vs paceTrendDeadlineOwnerWhy
Cedar HillsRisk Adjustment
Cedar Hills HCC capture recovery
Pair the 92 recapture drop-offs with their open annual visit slots.
$742k
34% / 55%
+4.2ppDec 31 submission close
118 days left
S. ChenSee the detail
Bluewater contractContracts
Bluewater performance recovery
Take the recovery plan to the next joint operating committee.
$640k
8% / 25%
+3.4ppDec 31 settlement
118 days left
VBC LeadSee the detail
Patel panelQuality
Patel panel annual wellness visit front-load
Rebook the open slots for the four panels holding the incentive.
$412k
44% / 60%
+3.8ppSep 30 scheduling cut-off
26 days left
J. ParkSee the detail
Summit MedicalTransitions
Summit 48-hour post-discharge contact
Call the 12 overdue contacts before anything else today.
$486k
61% / 58%
-1.9ppRolling — measured monthly
27 days left
M. AlvarezSee the detail